| W-0020 |
3/4" Through 2" Outlet Saddle Steel Cylinder Pipe |
06/25/2025 |
| W-0040 |
Typical Plan Layout Water Systems |
04/17/2024 |
| W-0050 |
Typical Plan Layout |
05/11/2022 |
| W-0070 |
Domestic Water Service, 3/4" and 1" |
04/30/2025 |
| W-0080 |
1" or 2" Service Manifold |
Coming Soon |
| W-0110 |
Domestic Water Service, 1 1/2" and 2" |
04/30/2025 |
| W-0110a |
Domestic Water Service with Backflow Assembly |
04/30/2025 |
| W-0125 |
Hot Tap 6-inch, 8-inch, 10-inch & 12-inch Mains |
05/22/2025 |
| W-0130 |
Abandonment 3/4-inch to 2-inches |
Coming Soon |
| W-0131 |
Abandonment 3-inches & above |
Coming Soon |
| W-0140 |
Reinforced Pipe Outlets Steel Cylinder Pipe |
01/01/2011 |
| W-0150 |
Gate Valve Assembly |
10/07/2024 |
| W-0155 |
Typical Valve Installation AWWA C-900 P.V.C. Pipe |
05/11/2022 |
| W-0214 |
4" Blowoff Assembly (Above Ground) |
01/15/2020 |
| W-0310 |
Bell and Spigot Joint Bonding Detail Steel Cylinder Pipe |
01/01/2011 |
| W-0320 |
Formed Bell & Spigot Joint Steel Cylinder CML-CC & CML-AW |
01/01/2011 |
| W-0350 |
Formed Bell & Spigot Joint Full Welded Detail CML & CC Pipe |
01/01/2011 |
| W-0354 |
Carnegie Joint CML & CC Pipe 14" Diameter and Larger |
01/01/2011 |
| W-0360 |
Lap Welded Slip Joint Belled End (CML-CC & CML-AW) |
01/01/2011 |
| W-0370 |
Weld Bell to Formed Spigot Joint Field Connection CML-CC & CML-AW |
01/01/2011 |
| W-0390 |
Slip On Weld Flange Joint CML & CC Pipe, 14" & Larger |
01/01/2011 |
| W-0410 |
Slip On Weld Flange Joint CML & CC, 4" thru 12" |
01/01/2011 |
| W-0440 |
Split Butt Strap Field Connection Steel Cylinder Pipe |
01/01/2011 |
| W-0460 |
1" or 2" Air Vacuum & Air Release Valve Assembly |
01/15/2020 |
| W-0490 |
Cathodic Protection Test Station Flange Insulation Gasket Kit |
01/01/2011 |
| W-0500 |
Cathodic Protection Underground Test Station Steel Cylinder Pipe |
01/01/2011 |
| W-0510 |
Cathodic Protection Above Ground Test Station Steel Cylinder Pipe |
01/01/2011 |
| W-0520 |
Double Check Valve Backflow Prevention Assy. (Do not use) |
01/01/2011 |
| W-0530 |
Double Check Alternate - Fire Department Connection 4”, 6”, 8” or 12” |
11/29/2025 |
| W-0531 |
Reduced Pressure Backflow Preventer Detector Assembly |
04/30/2025 |
| W-0532 |
Compact Reduced Pressure Detector Assembly for Large Services (N Style) |
04/30/2025 |
| W-0540 |
Casing for Metallic Pipe |
01/01/2011 |
| W-0580 |
Standard & Super Fire Hydrant |
06/25/2025 |
| W-0670 |
Butterfly Valve Assembly |
05/11/2022 |
| W-0680 |
Water Quality Sampling Station |
01/01/2011 |
| W-0690 |
Pitot Installation |
01/01/2011 |
| W-0700 |
Utility Vault |
01/01/2011 |
| W-0705 |
Ventilation Duct for Vaults |
05/13/2015 |
| W-0710 |
Standard Restraint Tee, Dead End, Bend (for P.V.C. C-900) |
04/17/2024 |
| W-0720 |
Locator Wire Installation |
05/08/2025 |
| W-0800 |
Anode Test Station Installation Detail |
01/01/2011 |
| W-0801 |
2-Anode Test Station Installation Detail |
06/02/2021 |
| W-0810 |
Copper Sulfate Reference Electrode Detail |
01/01/2011 |
| W-0820 |
Insulating Flange Detail |
01/01/2011 |
| W-0830 |
Magnesium Anode Detail |
01/01/2011 |
| W-0840 |
Alumino – Thermic Weld Detail (page 1 of 2) |
01/01/2011 |
| W-0850 |
Cathodic Protection Wiring Diagram |
01/01/2011 |
| W-0860 |
3” & 4” Compound Meter Installation |
01/01/2011 |
| W-0870 |
3” Turbo Meter Installation |
05/11/2022 |
| W-1000 |
Typical Plan Layout Sewer Systems |
03/04/2026 |
| W-1010 |
Typical Pipe Bedding Vitrified Clay Pipe Extra Strength |
01/01/2011 |
| W-1020 |
Concrete Arch |
01/01/2011 |
| W-1030 |
Classes "BB", "B", "C" & "D" Beddings |
01/01/2011 |
| W-1040 |
Concrete Encasement |
01/01/2011 |
| W-1050 |
Sewer Lateral "Normal Cut" |
01/01/2011 |
| W-1060 |
Sewer Lateral "Deep Cut" |
01/01/2011 |
| W-1070 |
Precast Concrete Manhole |
01/01/2011 |
| W-1071 |
Sewer Precast Concrete Sampling Manhole |
01/01/2011 |
| W-1073 |
Blow Off Assembly 6-Inch |
Coming Soon |
| W-1080 |
Drop Manhole |
01/01/2011 |
| W-1090 |
Sewer Clean Out & Terminus Manhole |
01/01/2011 |
| W-1100 |
Manhole Cover & Frame |
01/01/2011 |
| W-1110 |
Connection to Existing Main |
01/01/2011 |
| W-1120 |
Backwater Installation for House Connections |
01/01/2011 |
| W-1130 |
5” Diameter Manhole with Cast in Place Base |
06/30/2022 |
| W-1140 |
Shallow Manhole |
06/30/2022 |
| W-1150 |
4” and 6” Sewer Cut-In Wye Connections |
01/01/2011 |
| W-1160 |
Sewer On-Site Cleanout |
01/01/2011 |
| W-1170 |
Sewer Sample Wye |
01/01/2011 |
| W-1175 |
Grease Interceptor |
08/18/2017 |
| W-1210 |
Recycled Water Service 1 ½” and 2” |
01/01/2011 |
| W-1220 |
¾” Through 2” Outlet Saddle Steel Cylinder Pipe |
01/01/2011 |
| W-1225 |
1” Air Vacuum & Air Release Valve Assembly |
01/01/2011 |
| W-1230 |
Thrust Block Installation Class 150 & 200 |
01/01/2011 |
| W-1235 |
2” Air Vacuum & Air Release Valve Assembly |
01/01/2011 |
| W-1255 |
Typical Valve Installation AWWA C-900 P.V.C. Pipe |
01/01/2011 |
| W-1265 |
6” Blow-off Assembly (Below Ground) |
01/01/2011 |
| W-1270 |
Recycled Water Service ¾” and 1” |
01/01/2011 |
| W-1290 |
Water/Sewer location |
01/01/2011 |
| W-1520 |
4” Guard Posts |
01/01/2011 |
| W-1525 |
Utility Marker Post |
02/09/2026 |
| W-1540 |
Trench Backfill Standard No. 818 |
01/01/2011 |
| W-1550 |
Excavation and Backfill Details |
01/01/2011 |
| W-1560 |
Pressure Reducing Station Type "A" (Typical Layout) Page 1 of 4 |
01/01/2011 |
| W-1564 |
Pressure Reducing Station Type "B" (Typical Layout) Page 1 of 3 |
01/01/2011 |
| W-1566 |
Pressure Reducing Station Type "C" (Typical Layout) Page 1 of 3 |
01/01/2011 |
| W-1570 |
Thrust Block Installation Class 150 & 200 |
05/22/2025 |
| W-1580 |
Pressure Relief Valve Discharge Outlet |
01/01/2011 |
| W-1590 |
Chain Link Fence Detail |
01/01/2011 |
| W-1591 |
Chain Link Fence Detail |
01/01/2011 |
| LS-1 |
Sewer Lift Station Guidelines – Lift Station Plan |
01/01/2011 |
| LS-2 |
Sewer Lift Station Guidelines – Hatch Plan |
01/01/2011 |
| LS-3 |
Sewer Lift Station Guidelines – Lift Station Section |
01/01/2011 |
| LS-4 |
Sewer Lift Station Guidelines – Control Building Plan |
01/01/2011 |
| LS-5 |
Sewer Lift Station Guidelines – Control Building Section |
01/01/2011 |